Sentence requires to Santo Antonio and Jirau, who built their plants on the Madeira River, which “re-do immediately, the study and the environmental impact report”.
Sol de Pando: Brazil’s justice requires hydroelectrics pay compensation to people affected
Related Posts
Justice determines that Madeira River plants redo impact studies in Rondônia
March 13, 2014
Judge asked further studies to confirm that the environmental and social impacts are caused by the rise of water in hydroelectric reservoirs of Santo Antônio and Jirau.
Rondonia State is underwater, guilty of hydroelectrics?
March 20, 2014
In 2007, IBAMA did not want to license the plants on the Madeira. Heads rolled and the plants left. Now, are suspected to worsen flooding in the region.
El Deber: Brazil will analyze whether their dams caused flooding in Bolivia
March 3, 2014
Brazilian Commission will come to Bolivia to make a study oriented to verify whether the flooding in the country were caused by their dams