• News
  • Maps
  • Projects
  • About us
    • Contact
Discovery
MORE
Dark mode
Type size
Follow us
  • Twitter
  • Instagram
  • Facebook
  • YouTube
  • Português
  • Spanish
  • English
Skip to content
What are you looking for?
  • Twitter
  • Instagram
  • Facebook
  • YouTube
  • PT
  • ES
  • EN
InfoAmazonia

InfoAmazonia

What are you looking for?
  • News
  • Maps
  • Projects
  • About us
    • Contact
Discovery

Página inicial » Santo Antonio » Page 2

Tag: Santo Antonio

Sol de Pando: Brazil’s justice requires hydroelectrics pay compensation to people affected

By Giovanny Vera 13 de March de 201414 de September de 2020

Sentence requires to Santo Antonio and Jirau, who built their plants on the Madeira River, which “re-do immediately, the study and the environmental impact report”.

Madeira hydropowers are required to revise their dams impacts

By Giovanny Vera 12 de March de 201414 de September de 2020

Justice determines that Santo Antonio and Jirau hydroelectrics give assistance to victims of rains of are punishing Rondonia.

El Deber: Brazil will analyze whether their dams caused flooding in Bolivia

By Giovanny Vera 3 de March de 201414 de September de 2020

Brazilian Commission will come to Bolivia to make a study oriented to verify whether the flooding in the country were caused by their dams

Amazônia Real: Santo Antonio hydroelectric stops energy production for safety

By Giovanny Vera 26 de February de 201414 de September de 2020

Turbines and gates are disabled. The region faces a historic flooding in rural and urban areas and over 1300 families homeless.

Los Tiempos: Foreign Office study defines impact of dams in Bolivia

By Giovanny Vera 25 de February de 201414 de September de 2020

Study elaborated in 2013 is a monitoring system that identifies which areas are impacted, both in the short and medium term.

Rondoniaaovivo: Madeira River hydroelectrics exceed set limit and affect thousands of families

By Giovanny Vera 21 de February de 201414 de September de 2020

“State of emergency” was declared in Porto Velho due to heavy rains and great flood on the Madeira River. It could be the biggest flood in 100 years.

G1: Group evaluates possible rupture of hydroelectric gates in the Amazon

By Giovanny Vera 21 de February de 201414 de September de 2020

Experts assess the flood implications in the population lives in the capital, Porto Velho. Hydroelectrics deny any influence on the flood of the Madeira River.

Rondônia ao Vivo: Jirau power plant calls emptying the reservoir of Santo Antônio dam

By Giovanny Vera 12 de February de 201414 de September de 2020

San Antonio would be operating with a reservoir that last week, would have exceeded the maximum height of 74.8 meters.

Posts navigation

Newer posts 1 2

MOST READ

Rondonia State is underwater, guilty of hydroelectrics?

20 de March de 2014

Documentary shows influence of dams in flood in Porto Velho

2 de December de 2014

Justice determines that Madeira River plants redo impact studies in Rondônia

13 de March de 2014

Amazônia Blog: “Dams could result in catastrophy” says researcher

13 de March de 2014

Página Siete: The Amazon is very exploited and poorly studied

30 de June de 2014

  • Twitter
  • Instagram
  • Facebook
  • YouTube

CONTENT

  • News
  • Maps
  • Projects

INSTITUTIONAL

  • About us
  • Contact

OTHERS

  • Portuguese (Português)
  • Spanish (Español)

Web development by

Hacklab /